This week in Paddy’s Garage - Week 6. I’m still in the process of removing engine bay components and refurbishing them as I go. The main tasks this week were to:
Paint the brake/clutch pedal box and install the master cylinder.
. Remove and polish the Lucas 25D distributor.
Remove the Lucas generator
Remove and repair the PurOLator oil filter mounting.
Remove the Lucas starter
Begin removing cables, wires and minor accessories
Next week the engine bay work continues with labeling and organizing loose wires, removing hydraulic lines and cleaning and striping the engine.
Here are some of the highlights from this week -
Paint the brake/clutch pedal box and install the master cylinder.
Remove the Lucas generator
Remove and repair the PurOLator oil filter mounting
Remove the Lucas starter
Comments
You can follow this conversation by subscribing to the comment feed for this post.