Week 20 in Paddy’s Garage: This was a busy week as I wrapped up a ton of tasks in preparation for the “Official” First Start in 3 1/2 years!!
Install oil/water gauge
Install wiper switch wires
Install dash supports
Add 50/50 coolant
Install vac advance hose
Clean & Install radiator
Install carburetor choke & accelerator cable
Install rear view mirror
Install replacement dash knobs & switch
Change oil & filter
Connect lines to carbs
Connect heater cable
Install blower
Install fuel pump & hoses
Complete engine bay wiring - brake switch Adjust tappets (.012 cold) & valve cover
Center steering wheel & column
Tighten exhaust pipe mounting @ motor
FIRE IT UP FRIDAY
Check oil pressure
Check Tach Operation
Check ignition light
Mount Facet fuel pump
Remove mechanical pump & hoses
Install air filters